top of page

OUR PROJECTS

Borescope Inspection to check the internal components of the gas turbine and examine it's condition to prevent failure, cleaning of the compressor to improve efficiency and propose rehabilitation actions to be taken to improve the overall turbine output and performance.

Routine observation of mark IV speedtronic control system. 

Draining excess water from oil tank valve of gas turbine.

Inspection check of auxiliary gear compartment of gas turbine.

IMG_9854.JPG
IMG_2196.jpg

Provision of specialist technical support to ensure maximum reliability and availability for gas turbines and heat recovery steam generators that provides steady and uninterrupted power supply to the refinery

BORESCOPE INSPECTION 

RESIDENT ENGINEERS

20190505_130401_edited.jpg

Management review Dubai 

20190424_105328(0).jpg

Transfer knowledge and skills to the clients staff to preserve and optimize the turbine and provide steady and uninterrupted power supply to the plant,

TRAINING 

20191029_093731.jpg

Supply and Installation of Air-Inlet Filters to increase the performance and output of the Gas turbine

SPARE PART SOURCING

Inspection check of auxiliary gear compa
off loading air inlet filters GT2 (6).jp

Changing air inlet filter of gas turbine

Established drawback with CT neutral side 

Isolation of neutral after removing CT

Carrying out current injection test

bottom of page